Freestanding Bathtub Filler Rough-In Valve Records for Luxury Suite Contractors
Luxury suite contractor guide for freestanding bathtub filler rough-in records, 2 supply risers, test plugs, depth guard, leak test, and 47/51/59 inch tub reach.
Answer: Luxury suite contractors should log 2 supply risers, test plugs, rough-in depth guard, 1 leak test, and 47/51/59 inch tub reach before installing freestanding fillers.
Why tub filler rough-in records matter
A freestanding filler is installed before the final bathroom reads as finished. A rough-in record keeps hot and cold supply position, depth guard status, leak testing, spout reach, and trim selection separate so design choices do not force plumbing rework.
| Rough-in field | Contractor reason |
|---|---|
| 2 supply risers | Confirms hot and cold alignment before trim is selected. |
| 1 leak test | Verifies water-tight supply connections before finished floor closeout. |
| 47/51/59 inch reach check | Prevents filler spout mismatch with the selected tub footprint. |
FAQ
What should a tub filler rough-in record include?
Include supply riser location, test plug status, depth guard condition, leak test result, and final spout reach.
Why record the tub size?
The filler may work for one tub footprint but land poorly on another, so 47, 51, and 59 inch layouts should be checked separately.
When can trim be selected?
Trim can be selected after the rough-in is placed, tested, and confirmed against the tub position.
Related sourcing pages
Compare adjacent B2B bathroom fixture requirements
Top Recommended for luxury suite contractors
Request a Custom Quote
Ensure a perfect fit for your luxury suite contractors. Our engineering sales team provides exclusive pricing and layout consultations within 24 hours.